1. Baudin, M. (2002), Lean Assembly. The Nuts and Bolts of Making Assembly Operations Flow, Productivity Press, New York, NY.
2. Dougmeints, C., Breil, D. and Pun, L. (1983), La gestion de la production asistée par ordinateur, Hermes, Bordeaux.
3. Eisenhardt, K.M. (1989), “Building theories from case study research”, Academy of Management Review, Vol. 14, pp. 532‐50.
4. European Commission (2004), Manufuture, a Vision for 2020. Assuring the Future of Manufacturing in Europe, European Commission, Luxemburg.
5. Goldratt, E.M. and Fox, R.E. (1986), The Race, North River Press, Great Barrington, MA.