1. ADB and Ministry of Transport and Communication of the Republic of Armenia (2010a), “Preparing the North-South Road Corridor Development Project: Volume II, Tranche 1 preparation”, final Report No. TA7208-ARM, ADB, Mandaluyong City.
2. ADB and Ministry of Transport and Communication of the Republic of Armenia (2010b), “Preparing the North-South Road Corridor Development Project: Volume III, Tranche 2 preparation”, Final Report No. TA7208-ARM, ADB, Mandaluyong City.
3. The conditions of efficiency of a PPP for public finances,2013
4. Privatwirtschaftliche Modelle für Deutschlands Autobahnen: Vortrag im Rahmen des 2,2002