PurposeThe acknowledged mode of securing work by contractors is through the bidding process. However, the bidding decisions undertaken by some indigenous contractors in developing countries are fraught with challenges that often engender bidding practices (such as collusion through price fixing and intentional lower bidding) and threaten business survival. Therefore, in the quest to better understand these challenges and viable advocate solutions for overcoming them, this paper aims to identify the key challenges impacting the bid decision process by small indigenous building contractors in Dar es Salaam, Tanzania, and establish the strength of their relationship between the pairs of key challenges.Design/methodology/approachA comprehensive literature review was conducted to identify nine challenges impacting the bid decision of indigenous building contractors in Tanzania, which were used to design a questionnaire survey. Data collected were analysed using descriptive statistics, mean score, inferential statistics (One samplet-tests), Kendall’s concordance and correlation analysis.FindingsChallenges identified from a literature review were empirically tested using survey responses accrued from 33 participating small indigenous building contractors in Dar es Salaam, Tanzania. The findings illustrate that lack of liquidity, profit returns, lack of equipment, lack of experience of several works and procurement procedures are perceived as being the five most critical challenges. Project location, site accessibility and lack of labour were least critical. The major finding from the correlation analysis was the existence of the strong and positive correlation between “project location” and “site accessibility”.Research limitations/implicationsThe study is limited by its sample and geographical settings which focussed and confined the results on one country, Tanzania. However, the findings can be considered as important for other developing countries wishing to gain insights into the challenges impacting bid decisions.Practical implicationsMeasures for addressing the identified challenges impacting the bidding decisions of the indigenous small building contractors would be undertaken. The findings will enable contractors to not only reconcile the challenges with the industry and in so doing benefit both themselves and the clients but also enable them to be better prepared to deliver contractual obligations and generate socio-economic wealth. Government and policymakers will also be able to appropriately develop macro interventions for managing these challenges, which could be custom-tailored to indigenous small contractors. Finally, improving the ability of local firms to compete in the construction industry has been recognised as having the potential of advancing socio-economic development within the comity of developing countries.Originality/valueThe study enhances government, client and practitioners’ understanding of the challenges affecting the bidding practices among the indigenous building contractors in Tanzania. This area of investigation has previously been under explored particularly sub-Saharan Africa.

Publisher

Emerald

Subject

General Engineering

Reference90 articles.

1. Contractor development in Nigeria: perceptions of contractors and professionals;Construction Management and Economics,1977

2. Africa News (2019), “Tanzanian president orders deregistration of incompetent contractors”, available at: www.xinhuanet.com/english/africa/2019-09/04/c_138365121.htm, 4th September 2019 (accessed 25 February 2020).

3. Survival strategies of built environment organisations in a challenging economy;Engineering, Construction and Architectural Management,2018

4. Questionnaire survey on bidding in construction;Journal of Management in Engineering,1988

5. Factors influencing success rate of contractors in competitive bidding for construction works in South-East;Journal of Construction in Developing Countries,2016

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Project Cost Management and Performance of National Housing Corporation Projects in Kenya.;International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p);2023-12-04

2. Barriers and Challenges for Public Procurement Integrity in Iraq: Systematic Review Study;KSCE Journal of Civil Engineering;2023-07-22

3. Barriers to Mentoring of Graduates in Quantity Surveying Firms in Tanzania: A Factor Analysis Approach;International Journal of Construction Education and Research;2022-07-08

4. Evaluation of organizational procurement performance for public construction projects: systematic review;International Journal of Construction Management;2022-04-29

5. Perception on constraining factors impacting recruitment and selection practices of building contractors in Dar Es Salaam, Tanzania;International Journal of Construction Management;2022-02-07

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3