Causes of delay in construction projects: a quantitative analysis

Author:

Viles Elisabeth,Rudeli Natalia Carolina,Santilli Adrian

Abstract

Purpose The purpose of this paper is to perform a quantitative analysis of the literature in order to determine the main causes of delay in construction projects. Design/methodology/approach A set of 47 articles from the literature were analyzed, yielding 1,057 different causes of delay. In order to analyze and compare the main causes of delay, their degree of impact was studied statistically. Next, a mention count method was used to determine the primary causes of construction project delays and through the use of Pareto diagrams, the main causes of delays in construction projects were determined. Findings It was determined that the three main causes of construction project delay are problems that occur during execution, administrative problems and labor conflicts; together they account for almost 80 percent of the causes found in the literature. Moreover, it was deduced that problems during execution are based on unpredictable events, while administrative problems are rooted in poor cash flow management. In addition, seven sub-groups of delay causes were identified as being major due to the number of mentions detected. These were “Changes during construction,” “Poor construction management,” “Construction errors,” “Economic/Financial,” “Conflict/Relationship” and “Lack of experience.” Practical implications This study provides a unique classification method, which was successfully validated, for the causes of construction project delay. Thanks to the classification, designers may use this information as a starting point for designing future construction projects, thereby minimizing the appearance of unforeseen events during construction. Moreover, the results of this study will help project managers be aware of the possible causes of delay that may affect their construction projects. This understanding can help them identify potential risks in the initial phases of the project and allow decisions to be made early before problems arise or the consequences of the deviations become irreparable. The results can also serve as input for the development of future management improvement methodologies that are aimed at reducing costs and ensuring that deadlines are met. Social implications Identifying the factors and causes of the delays will allow mitigation actions to be taken in order to avoid delays, which will ultimately allow homes, schools, hospitals and other necessary infrastructure to be delivered on time or even before the planned date. Originality/value This study provides a unique classification method that was successfully validated. Thanks to the classification, designers may use this information as a starting point for designing future construction projects, thereby minimizing unforeseen events during construction.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference67 articles.

1. Asociation for the advancement of cost engineering international. ‘recommended practice’ N° 29R-03: forensic schedule analyuis;AACE;AACE International,2007

2. Causes of delay in MARA managment procurement construction projects;Journal of Surveying, Construction and Property,2010

3. Identification of causes of non-excusable delays of construction projects,2011

4. Construction delays in florida: an empirical study;Department of Community Affairs – State of Florida,2003

5. The effects of construction delays on project delivery in Nigerian construction industry;International Journal of Project managment,2002

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3