Improvement of an order-to-cash business process by deploying lean six sigma tools: a case study

Author:

Kääriä Emilia,Shamsuzzoha AhmORCID

Abstract

PurposeThis study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the most visible process to the customer, and therefore, its punctual and fluent order management is vital. It is observed that the high degree of manual work in the O2C process causes mistakes, delays and rework in the process. The purpose of this article is therefore to analyze the case company's current state of the O2C process as well as to identify the areas of development in this process by deploying the means of Lean Six Sigma tools such as value stream mapping (VSM).Design/methodology/approach The study was conducted as a mix of quantitative and qualitative analysis. Based on both the quantitative and qualitative data, a workshop on VSM was organized to analyze the current state of the O2C process of a case company, engaged in the energy and environment sector in Finland.Findings The results found that excessive manual work was highly connected to inadequate or incorrect data in pricing and invoicing activities, which resulted in canceled invoices. Canceled invoices are visible to the customer and have a negative impact on the customer experience. This study found that by improving the performance of the O2C process activities and improving communication among the internal and external stakeholders, the whole O2C process can perform more effectively and provide better customer value.Originality/value The O2C process is the most visible process to the customer and therefore its punctual and fluent order management is vital. To ensure that the O2C process is operating as desired, suitable process performance metrics need to be aligned and followed. The results gathered from the case company's data, questionnaire interviews, and the VSM workshop are all highlighted in this study. The main practical and managerial implications were to understand the real-time O2C process performance, which is necessary to ensure strong performance and enhance continuous improvement of the O2C process that leads to operational excellence and commercial competitiveness of the studied case company.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference75 articles.

1. BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints;Journal of Construction Engineering and Management,2020

2. Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study;International Journal of Production Economics,2007

3. Worker safety improvement at paper pleating production line using Poka-Yoke concept-a case study in automotive industry;Journal of Mechanical Engineering (JMechE),2017

4. Implementation of kaizen for continuous improvement of productivity in garment industry in Bangladesh;American Academic and Scholarly Research Journal,2015

5. Al Ayyubi, M.C., Mahmudah, H., Saleh, A. and Rachmadi, R.R. (2020), “Implementation of poka-yoke system to prevent human error in material preparation for industry”, in 2020 International Seminar on Intelligent Technology and its Applications (ISITIA), IEEE, pp. 273-278.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3