Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam

Author:

Hong Pham Linh,Hadikusumo Harimurti

Abstract

Purpose – Petrochemical projects play a very important role in the economic development of Vietnam. For the past ten years, many large-scale petrochemical plants have been developed using the engineering, procurement and construction (EPC) project delivery system for completing the project faster. However, many projects have suffered from schedule delays. In order to solve the delay problem, a clear understanding of the EPC business model and its delays problems are studied in this research. A qualitative research method by using case study on selected EPC projects was adopted. This paper aims to define the current business models used in the Vietnamese petrochemical industry and explores the root cause of delays. Design/methodology/approach – The research methodology used in this study is multiple case studies by purposive sampling on EPC projects. This is chosen due to the limited number of EPC projects in petrochemical in Vietnam and to obtain schedule delay factors from both delayed and on-time projects. In this purposive sampling, the researcher decided on what needs to know and sets out to find the people who can and are willing to share their information. From each project, project manager and project engineer were interviewed to understand the delay factors in their EPC projects. Data from the interview were analyzed by using “pattern coding” described by Miles and Huberman. Then, cross-case analysis was used to identify the common and unique factors occurring in each case. By comparing the three cases, the authors can identify the delay factors in EPC petrochemical in Vietnam. Findings – By interviewing the management level officers in three cases and performing exploratory work on the secondary data, it was observed that the local and foreign contractors of EPC projects in Vietnam have generally similar business process. Then, the codes were grounded based on the EPC business process, and subjected to the cross-case analysis. The root cause of problems in each phase was provided. Originality/value – The paper fulfills an identified root cause of EPC projects in Vietnam.

Publisher

Emerald

Subject

Strategy and Management,General Energy

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3