Purpose This study aims to assist the project manager in minimising the material logistics cost of road project by planning the optimal movement of aggregate across three stages of supply chain: sourcing, processing and distribution. Design/methodology/approach The paper conceptualises the raw material consumption in a road project as a logistics network distribution problem. A linear programming (LP) formulation is constructed with appropriate decision variables by integrating the three stages of material movement. The series of LP scenarios are solved using an LP solver to decide the optimal movement of the aggregate to be consumed in different layers of road segments. Findings The results obtained from the model show that planning material logistics of an entire road project using optimisation provides substantial saving in logistics costs than using common sense. Further, the magnitude of cost saving improves as the complexity of the model increases in term of enormous feasible options. Practical implications The model shown in this paper may serve as a basis for planning the logistics of raw materials consumed in the road projects. The small improvement in material flows by optimising supply chain shows sensible cost benefit to the project manager and hence control and monitor the overall cost and activities of the project. The output of the model is also expected to help the project team as an input in the decision-making processes such as appropriate material sourcing contract, capacity assessment of material processing facility and transportation planning. Originality/value While the optimisation models are widely used and popular among the many industrial applications, this research shows distinct application of such a model in managing the logistics of the road construction project.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference44 articles.

1. Optimization algorithm for selection and on site location of mobile cranes;Journal of Construction Engineering and Management,2005

2. Causes of delay in large construction projects;International Journal of Project Management,2006

3. Logistics network design: modelling and informational considerations;The International Journal of Logistics Management,1995

4. Optimization modeling for logistics: options and implementations;Journal of Business Logistics,2012

5. An exploration into cost-influencing factors on construction projects;International Journal of Project Management,2014

Cited by 22 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3