Development of a project complexity measurement model for metro rail projects

Author:

Sruthilaya Dara,Vilventhan Aneetha,Gopal P.R.C.

Abstract

PurposeThe purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project complexities on the performance of metro rail projects.Design/methodology/approachThis study employed a two-phase research methodology. The first phase identifies complexities through a literature review and expert discussions and categorizes different types of complexities in metro rail projects. In the second phase, BWM, a robust multi-criteria decision-making (MCDM) technique, was used to prioritize key complexities, and a PCI model was developed. Further, the developed PCI was validated through case studies, and sensitivity analysis was performed to check the accuracy and applicability of the developed PCI model.FindingsThe analysis revealed that location complexity exerted the most substantial influence on project performance, followed by environmental, organizational, technological and contractual complexities. Sensitivity analysis revealed the varying impacts of complexity indices on the overall project complexity.Practical implicationsThe study's findings offer a novel approach for measuring project complexity's impact on metro rail projects. This allows stakeholders to make informed decisions, allocate resources efficiently and plan strategically.Originality/valueThe existing studies on project complexity identification and quantification were limited to megaprojects other than metro rail projects. Efforts to quantitatively study and analyze the impact of project complexity on metro rail projects are left unattended. The developed PCI model and its validation contribute to the field by providing a definite method to measure and manage complexity in metro rail projects.

Publisher

Emerald

Reference39 articles.

1. Transportation infrastructure development in the UAE: stakeholder perspectives on management practice;Construction Innovation,2012

2. Construction client multi-projects - a complex adaptive systems perspective;International Journal of Project Management,2009

3. Modelling and managing project complexity;International Journal of Project Managementmenet,2007

4. Risk assessment in construction schedules;Journal of Construction Engineering and Management,1999

5. The concept of project complexity - a review;International Journal of Project Management,1996

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Critical success criteria for construction projects: a systematic literature evaluation;Engineering, Construction and Architectural Management;2024-08-21

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3