Author:
Burnetas Apostolos N.,Katehakis Michael N.
Abstract
Two types of tasks are to be scheduled on a single processor under incomplete information about the task lengths. We derive the structure of optimal scheduling rules w.r.t. flowtime, as well as asymptotic approximations for a large number of tasks, when the length distributions belong to a one-parameter exponential family.
Publisher
Cambridge University Press (CUP)
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Statistics, Probability and Uncertainty,Statistics and Probability
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献