Benchmark Simulation Model No 2: finalisation of plant layout and default control strategy

Author:

Nopens I.1,Benedetti L.1,Jeppsson U.2,Pons M.-N.3,Alex J.4,Copp J. B.5,Gernaey K. V.6,Rosen C.7,Steyer J.-P.8,Vanrolleghem P. A.9

Affiliation:

1. BIOMATH, Ghent University, Coupure Links 653, B-9000 Ghent, Belgium

2. IEA, Lund University, Box 118, SE-221 00 Lund, Sweden

3. LSGC-CNRS-ENSIC-INPL, 1 rue Grandville, BP 451, F-54001 Nancy cedex, France

4. ifak e.V. Magdeburg, Steinfeldstr. 3, D-39179 Barleben, Germany

5. Primodal, Inc., 122 Leland Street, Hamilton Ontario L8S 3A4, Canada

6. Deptartment of Chemical and Biochemical Engineering, Technical University of Denmark, Building 229, DK-2800 Kgs. Lyngby, Denmark

7. Veolia Water—Solutions & Technology, VA-Ingenjörerna, Scheelegatan 3, SE-212 28 Malmö, Sweden

8. INRA, UR050, Laboratoire de Biotechnologie de l'Environnement, Avenue des Etangs, Narbonne F-11100, France

9. modelEAU, Dépt de génie civil, Université Laval, Québec, G1K 7P4 QC, Canada

Abstract

The COST/IWA Benchmark Simulation Model No 1 (BSM1) has been available for almost a decade. Its primary purpose has been to create a platform for control strategy benchmarking of activated sludge processes. The fact that the research work related to the benchmark simulation models has resulted in more than 300 publications worldwide demonstrates the interest in and need of such tools within the research community. Recent efforts within the IWA Task Group on “Benchmarking of control strategies for WWTPs” have focused on an extension of the benchmark simulation model. This extension aims at facilitating control strategy development and performance evaluation at a plant-wide level and, consequently, includes both pretreatment of wastewater as well as the processes describing sludge treatment. The motivation for the extension is the increasing interest and need to operate and control wastewater treatment systems not only at an individual process level but also on a plant-wide basis. To facilitate the changes, the evaluation period has been extended to one year. A prolonged evaluation period allows for long-term control strategies to be assessed and enables the use of control handles that cannot be evaluated in a realistic fashion in the one week BSM1 evaluation period. In this paper, the finalised plant layout is summarised and, as was done for BSM1, a default control strategy is proposed. A demonstration of how BSM2 can be used to evaluate control strategies is also given.

Publisher

IWA Publishing

Subject

Water Science and Technology,Environmental Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3