Affiliation:
1. Department of Environmental Sciences and Engineering, Kheradgarayan Motahar Institute of Higher Education, Mashhad, Iran
Abstract
Abstract
This study focuses on determining the bio-kinetic coefficients of chemical oxygen demand (COD) removal in full-scale primary facultative ponds (PFPs) system on the basis of 3-year continuous operation. The mean removal of chemical oxygen demand (COD), total suspended solid (TSS) and volatile suspended solid (VSS) were 80, 59 and 49%, respectively. The first-order model paired with continuous stirred-tank reactor (CSTR) and plug flow (PF) regimes, PF k–C*, Stover-Kincannon and Grau second-order models were applied to link COD concentrations at the inlet and outlet of the system and to compare the predictive power of models for the estimation of effluent COD concentrations. The Stover-Kincannon model showed the best adaptability (r2 = 0.9294) with the maximum substrate utilization rate (Umax) of 79.14 g/L· d and saturation constant (KB) of 80.65 g/L· d, whereas the Grau second-order model was the best model to predict outlet COD concentrations (r2 = 0.6925). The computed constants, m and n, of the Grau second-order model were 0.6725 and 15.867 d−1, respectively. While the Stover-Kincannon kinetic rates obtained in this study can be used to design the PFP systems in similar operational conditions, the appropriate prediction of pond behavior can be achieved using the Grau model.
Funder
The research received no funds.
Subject
Water Science and Technology,Environmental Engineering
Reference29 articles.
1. Kinetic evaluation and process analysis of COD and nitrogen removal in UAASB bioreactor;Journal of the Taiwan Institute of Chemical Engineers,2017
2. Kinetic analyses of the operation of mesophilic and thermophilic anaerobic filters treating a simulated starch wastewater;Process Biochemistry,2000
3. First-order removal rates for organic matter in full-scale waste stabilization pond systems in Northeastern Brazil;Water, Air, & Soil Pollution,2020
4. Kinetics of organic removal in fixed-bed aerobic biological reactor;Bioresource Technology,2008
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献