Author:
Albogami Saad M.,Ariffin Mohd Khairol Anuar Bin Mohd,Supeni Eris Elianddy Bin,Ahmad Kamarul Arifin
Abstract
In this paper, a new hybrid AHP and Dempster-Shafer Theory of Evidence is presented for solving the problem of choosing the best project among a list of available alternatives while uncertain risk factors are taken into account. The aim is to minimize overall risks. For this purpose, four groups of risk factors, including Properties, Operational and Technological, Financial, Strategic risk factors, are considered. Then using an L24 Taguchi method, several experiments with various dimensions have been designed and solved by the proposed algorithm. The outcomes are then analyzed using the Validating Index (VI), Reduced Risk Indicator (R.R.I%), and Solving time. The findings indicated that, compared to the classic AHP, the results of the proposed hybrid method were different in most cases due to uncertainty of risk factors. It was observed that the method could be safely used for selecting project problems in real industries.
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献