Affiliation:
1. Lucian Blaga University of Sibiu, Sibiu , Romania
2. Sapientia Hungarian University of Cluj Napoca , Romania
Abstract
Abstract
Risk assessment is one the key activities of any project. The unexpected situations can have catastrophic consequences. Risk assessment tries to estimate to potential known unknowns, but there is no guarantee to foresee all circumstances around a project. In this situation the project team must be adaptive and find solutions by cooperation, creativity and abductive reasoning. In the paper we tried to analyse on what extent a project and a project team can be handled as a complex adaptive system. More precisely, how the scientific and practical achievements of the theory of complex adaptive systems (CAS) can be used in project management. More exactly, we analyse the applicability of the Holonic Multi-Agent Systems in risk management of the projects. We consider the way in which holons handle the unexpected situations can be a model in project management.
Reference10 articles.
1. Bar-Yam, Y. (1997). Dynamics of Complex Systems, Reading, Mass: Addison-Wesley, Perseus Books, Massachusetts, ISBN: 978-020155748
2. Boy G.A. (2013): Dealing with the Unexpected in our Complex Socio-Technical World, 12th IFAC Symposium on Analysis, Design, and Evaluation of Human-Machine Systems, August 11-15, 2013. Las Vegas, NV, USA
3. Holland J. H (2006). Studying Complex Adaptive Systems Journal of Systems Science and Complexity. 19 (1): 1-8. doi:10.1007/s11424-006-0001-z
4. Hordijk, W., 2013. Autocatalytic sets: from the origin of life to the economy. BioScience 63, 877-881
5. Muriana, C., Vizzini G., (2017) Project risk management: A deterministic quantitative technique for assessment and mitigation, International Journal of Project Management, Volume 35, Issue 3, April 2017, Pages 320-340
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献