Using extreme gradient boosting (XGBoost) machine learning to predict construction cost overruns
Author:
Affiliation:
1. Department of Building Technology, Ho Technical University, Ho, Volta Region, Ghana
2. Wits Business School, University of the Witwatersrand, Johannesburg, South Africa
Publisher
Informa UK Limited
Subject
Management of Technology and Innovation,Strategy and Management,Building and Construction,Architecture
Link
https://www.tandfonline.com/doi/pdf/10.1080/15623599.2023.2289754
Reference71 articles.
1. Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
2. Acharya NK Lee YD Kim SY Lee JC Kim CS. 2006. Analysis of construction delay factor: a Korean perspective. Proceedings of the 7th Asia Pacific Industrial Engineering and Management Systems Conference 2006 p. 883–895.
3. Risk perception and Bayesian analysis of international construction contract risks: The case of payment delays in a developing economy
4. Ahiaga-Dagbui DD Smith SD. 2012. Neural networks for modelling the final target cost of water projects.
5. Systematic literature review of project manager's leadership competencies
Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Green artificial intelligence for cost-duration variance prediction (CDVP) for irrigation canals rehabilitation projects;Expert Systems with Applications;2024-09
2. Machine learning algorithms for safer construction sites: Critical review;Building Engineering;2024-04-26
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3