1. Dawson, T.A., et al. 2011. Selection of optimum pavement treatment type and timing at the project level. In: TRB 90th annual meeting compendium of papers DVD[CD-ROM]Washington, DC: Transportation Research Board of the National Academies.
2. Gransberg, D. and James, D.M.B., 2005. Chip seal best practices, a synthesis of highway practice. Washington, DC: Transportation Research Board, Publication NCHRP Synthesis 342.
3. Estimating Optimum Timing for Preventive Maintenance Treatment to Mitigate Pavement Roughness
4. Optimum Time for Application of Slurry Seal to Asphalt Concrete Pavements