Author:
Meesit Ratthaphong,Andrews John
Reference10 articles.
1. Blenkers LL (2015) Railway disruption management. Delft University of Technology
2. Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transp Res Part B Methodol 63:15–37
3. Ghaemi N, Cats O, Goverde RMP (2017) Railway disruption management challenges and possible solution directions. Public Transp 9(1–2):343–364
4. Hofman M, Madsen L, Groth JJ, Clausen J, Larsen J (2006) Robustness and recovery in train scheduling—a simulation study from DSB S-tog a/s. In: 6th workshop on algorithmic methods and models for optimization of railways (ATMOS), pp 1–22
5. Jespersen-Groth J, Potthoff D, Clausen J, Huisman D, Kroon L, Maroti G, Nielsen M (2009) Disruption management in passenger railway transportation. In: Robust and online large-scale optimization. Springer, Berlin Heidelberg, pp 399–421