Author:
Du Haipeng,Shao Lizhen,You Yang,Li Zhuolin,Fu Dongmei
Reference18 articles.
1. Borzsony S, Kossmann D, Stocker K (2001) The skyline operator. In: Proceedings 17th international conference on data engineering. IEEE, Heidelberg, pp 421–430.
https://doi.org/10.1109/ICDE.2001.914855
2. Tomoiagă B, Chindriş M, Sumper A, Sudria-Andreu A, Villafafila-Robles R (2013) Pareto optimal reconfiguration of power distribution systems using a genetic algorithm based on NSGA-II. Energies 6(3):1439–1455.
https://doi.org/10.3390/en6031439
3. Rodger JA, Pankaj P, Nahouraii A (2014) A petri net pareto ISO 31000 workflow process decision making approach for supply chain risk trigger inventory decisions in government organizations. Intell Inf Manag 6:157–170.
https://doi.org/10.4236/iim.2014.63017
4. Özyer T, Zhang M, Alhajj R (2011) Integrating multi-objective genetic algorithm based clustering and data partitioning for skyline computation. Appl Intell 35(1):110–122.
https://doi.org/10.1007/s10489-009-0206-7
5. Tan KL, Eng PK, Ooi BC (2001) Efficient progressive skyline computation. In: VLDB 2001 proceedings of the 27th international conference on very large data bases, vol 1. Morgan Kaufmann, San Francisco, pp 301–310
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献