Balanced Optimization System of Construction Project Management Based on Improved Particle Swarm Algorithm
Publisher
Springer Singapore
Reference11 articles.
1. Cajzek, R., Klansek, U.: Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Eng. Constr. Archit. Manag. 26(10), 2474–2508 (2019)
2. Baek, Y.S., Lee, S., Filatov, M., et al.: Optimization of three state conical intersections by adaptive penalty function algorithm in connection with the mixed-reference spin-flip time-dependent density functional theory method (MRSF-TDDFT). J. Phys. Chem. A 125(9), 1994–2006 (2021)
3. Li, N., Wang, S.: Pricing options on investment project expansions under commodity price uncertainty. J. Ind. Manag. Optim. 15(1), 261–273 (2019)
4. Davydova, T., Arsen’Ev, Y., Shelobaev, S.: Project and program management with optimization of their functioning. Econ. XXI Century Innov. Invest. Educ. 7(1), 38–45 (2020)
5. He, W., Shi, Y., Kong, D.: Optimization model calculation of construction cost and time based on genetic algorithm. IOP Conf. Ser. Earth Environ. Sci. 242(6), 062044 (7 pp) (2019)