Prediction of Construction Water Inflow of Karst Water-Rich Tunnel Without Drainage Tunnel

Author:

Li Wei,Hao Shiquan,Wang Ju,Zou Junpeng

Abstract

AbstractThe construction of infrastructure in China faces substantial challenges due to the complex geological conditions and groundwater in karst areas, particularly in tunnel construction. The construction of the Maoping Port railway tunnel in the Three Gorges Hub area has been accompanied by the emergence of caves and faults. The excavation process for the tunnel has been found to expose caves and cavities, leading to sudden surges of water and mud, which can pose a risk. Hence, there is a pressing need to precisely forecast the water inflow in the karst region of Yangmuling Tunnel, in order to furnish guidance for the tunnel’s drainage and to avert surging water disasters in the absence of a relief hole. This study focuses on the water-rich karst issue in Yangmuling Tunnel. The research employed on-site hydraulic pressure monitoring and finite element numerical simulation to investigate the seepage and water influx properties of the tunnel without water relief hole. The outcomes of the study reveal that a low water pressure zone forms near the tunnel after excavation, and water pressure gradually increases outward. When the tunnel reaches the karst pipe, there is a sharp increase in water influx. Simultaneously, the low water pressure zone in the karst area sharply expands, resulting in an irregular shape. Excavation of the tunnel exposed the karst pipe, causing a rise in flow velocity in the karst zone towards the front of the tunnel face, but it subsequently declined rapidly. The alteration in flow velocity within the rock section surrounding the tunnel face was comparatively uniform.

Publisher

Springer Nature Singapore

Reference13 articles.

1. Li, L.C., Tang, C.A., Liang, Z.Z., Ma, T.H., Zhang, Y.B.: Numerical simulation on water inrush process due to activation of collapse columns in coal seam floor. J. Min. Saf. Eng. 26(2), 158–162 (2009)

2. Hwang, J.H., Lu, C.C.: A semi-analytical method for analyzing the tunnel water inflow. Tunn. Undergr. Space Technol. 22(1), 39–46 (2007)

3. Zhang, Q.S., Wang, D.M., Li, S.C.: Development and application of water and mud burst model test system for tunnel in fault fracture zone. Chin. J. Geotech. Eng. 39(03), 417–426 (2017)

4. Wang, D.M., Zhang, Q.S., Zhang, X.: Fault fracture zone tunnel water inrush disaster mud evolution model test research. Rock Soil Mech. 5(10), 2851–2860 (2016). https://doi.org/10.16285/smj.r.2016.10.016

5. Fu, H.L., Li, J., Cheng, G.W.: Based on the conformal mapping of faults zone tunnel water inflow prediction. J. Huazhong Univ. Sci. Technol. (Nat. Sci. Ed.) 49(01), 86–92 (2021). https://doi.org/10.13245/j.hust.210115

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3