1. ANL (2019) U.S. efforts in support of examinations at Fukushima Daiichi—2019 evaluations. ANL-19/08. Argonne National Laboratory (ANL), Argonne, IL
2. ASME (2013) ASME/ANS RA-Sa-2013. Addenda to ASME/ANS RA-S-2008: standard for level 1/large early release frequency probabilistic risk assessment for nuclear power plant applications, an American national standard. American Society of Mechanical Engineers, New York, NY
3. Bocanegra R, Di Marcello V, Sanchez-Espinoza VH, Jiménez G (2016) Fukushima unit 2 accident simulation with MELCOR 2.1. In: Proceedings of the 24th international conference on nuclear engineering ICONE24, June 26–30, 2016, Charlotte, NC, USA. Paper ICONE24-61079
4. ENSI (2018) Fukushima Daiichi. Menschliche und organisatorische Faktoren. Teil 2: Der Ablauf der Ereignisse aus Sicht der beteiligten Menschen vor Ort. ENSI-AN-10426. Swiss Federal Nuclear Safety Inspectorate ENSI. Brugg, Switzerland, October 2018. (in German)
5. EPRI (2012) Severe accident management guidance technical basis report. Electric Power Research Institute (EPRI), Palo Alto, CA, USA