1. Burnwal, S., Deb, S.: Scheduling optimization of flexible manufacturing system using cuckoo search-based approach. Int. J. Adv. Manuf. Technol. 2(64), 951–959 (2013)
2. Deb, S, Yang, X.S.: Engineering optimization by cuckoo search. Int. J. Math. Model. Numer. Optim. 1(4), 330–343 (2010)
3. Shahrestani, F.K., Mahbobi, H., Mohebi, E., Mosaffa, H.B.: Optimization of scheduling flexible manufacturing systems by using multi-objective Genetic algorithm. Inter. Discipl. J. Contemp. Res. Bus. 5(1), 1015–1023 (2013)
4. Gopikrishna, N., Nagabrahmam, P.: Review of flexible manufacturing systems on rational exploration of flexible manufacturing systems. Int. Res. J. Eng. Technol. 3(2), 625–629 (2016)
5. Jerald, J., Asokan, P., Prabaharan, G., Saravanan, R.: Scheduling optimization of flexible manufacturing systems using particle swarm optimization algorithm. Int. J. Adv. Manuf. Technol. 25(9), 964–971 (2005)