1. Wang, Y., et al.: The evaluating method for potential remaining oil and utilization degree in Sazhong area. J. DAQING Petrol. Inst. 33(2), 48–52 (2009)
2. Liu, J.-Y., Liu, M.-Y., Xu, H.: Analysis and quantitative calculation on influencing factors of recovery percent at the high water cut stage-a case study of Sazhong development area, Daqing oilfield. Petrol. Geol. Recovery Effi. 17(1), 62–67 (2010)
3. Cheng, H.: High-efficiency fracturing technology applied in the water flooding in the stage of ultra high water cut. Petrol. Geol. Oilfield Dev. Daqing 32(2), 150–153 (2013)
4. Cai, W.-B., et al.: Horizontal well fracturing technology for reservoirs with low permeability. Pet. Explor. Dev. 36(1), 80–85 (2009)
5. Hu, R.-H., et al.: Permeability limitation of the network fracturing in the tight oil reservoir. Petrol. Geol. Oilfield Dev. Daqing 34(5), 166–169 (2015)