1. Geda MW (2014) A linear programming approach for optimum project scheduling. Int J Eng Res Technol 3(10):1271–1275
2. Agyei W (2015) Project planning and scheduling using PERT and CPM techniques with linear programming: case study. Int J Sci Technol Res 4(8):222–227
3. Vyas RS (2013) Project management using crashing CPM network to get project completed on time. Int J. Eng Res Technol (IJERT) 2(2):1–12
4. Elmabrouk OM (2012) Scheduling project crashing time using linear programming technique. In: Proceedings of the 2012 international conference on industrial engineering and operations management Istanbul, Turkey 3–6 July 2012
5. Hartmann S (2001) Project scheduling with multiple modes: a genetic algorithm. Ann Oper Res 102:111–135