Abstract
AbstractWith the rapid development of the method of shield tunnel in our country, the shield in the tunnel and the internal structure exist a lot of prefabricated and assembled internal structure can be roughly divided into full cast-in-place, full precast, and precast and cast-in-place structure. However, it has the disadvantages of more internal structural joints, poor waterproof performance, and complex structural stress. Therefore, combined with the actual engineering case, the construction process is simulated by using the finite element analysis software, and the influence of the segmental and internal structure cooperative deformation and joint mechanical performance is considered to further analyze the deformation characteristics of shield tunnel assembly internal structure, which can provide a reference for the construction and design of similar projects.
Reference13 articles.
1. Yu, C., Zhou, A.N., Chen, J., et al.: Analysis of a tunnel failure caused by leakage of the shield tail seal system. Undergr. Space 5(2), 105–114 (2020)
2. Liu, J.W., Shi, C.H., Lei, M.F., et al.: A study on damage mechanism modelling of shield tunnel under unloading based on damage-plasticity model of concrete. Eng. Fail. Anal. 123, 105261 (2021)
3. Tang, F., He, Y.D.: Research on the internal structures of road - metro shield tunnel. J. Railw. Eng. Soc. 30(12), 57–63 (2013)
4. Liu, N.: Analysis of and countermeasures against the assembly deviations of prefabri-cated and assembled lane structure in double-deck shield-driven tunnels. Mod. Tunn. Technol. 58(04), 210–217 (2021)
5. Geng, P., Wang, Q., Guo, X.Y., et al.: Pull-out test of longitudinal joints of shield tunnel. China J. Highw. Transp. 33(07), 124–134 (2020)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献