1. Ayres, R.: (1) Future trends in factory automation, (2) Technology forecasts for CIM. Manuf. Rev. 1, 2 (1989)
2. Jain, A.S.; Meeran, S.: Deterministic job-shop scheduling: past, present and future. Eur. J. Oper. Res. 113, 390–434 (1999)
3. Palei, S.: Optimization of choosing the rule for changing a cutting tool in exploitation of the flexible manufacturing module. Stanki Instrum. 11, 27–30 (1988)
4. Al-Fawzan, M.; Al-Sultan, K.: A tabu search based algorithm for minimizing the number of tool switches on a flexible machine. Comput. Ind. Eng. 44, 35–47 (2003)
5. Groover, T.A.: Impedance Cardiography: Techniques Applicable to Extrapolation. University of Texas at Austin, Austin (1981)