1. Akay A, Sessions J (2001) Minimizing road construction plus forwarding costs under a maximum soil disturbance constraint. In: The international mountain logging and 11th pacific northwest skyline symposium December 10–12, Seattle, Washington, USA, pp 268–279
2. Bryer JB (1983) The effects of a geometric redefinition of the classical road and landing spacing model through shifting. J For Sci 29(3):670–674
3. Chung W, Sessions J, Heinimann HR (2004) An application of a heuristic network algorithm to cable logging layout design. Int J For Eng 15(1):11–24
4. Epstein R, Weintraub A, Sapunar P, Nieto E, Sessions JB, Sessions J, Bustamonte F, Musante H (2006) A combinatorial heuristic approach for solving real-size machinery location and road design problems in forestry planning. Oper Res 54(6):1017–1027
5. FAO (1974) Logging and log transport in tropical high forest. FAO, Rome 90 p