1. CalTrans. (2004). Contract cost data, Department of Transportation, Sacramento, CA.
2. Chun, Y. B. and Ahn, J. W. (2001). “Approximate cost estimating model based on historical cost data on golf course.” Journal of Institute of Technology and Science, Chung Ang University, Vol. 31, pp. 71–80.
3. Hegazy, T. and Ayed, A. (1998). “Neural network model for parametric cost estimation of highway projects.” Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 3, pp. 210–218.
4. Hartgen, D. T. and Talvitie, A. P. (1995). “Comparative performance of transportation systems: Pitfalls and prospects.” Proc., World Conf. on Transit Research, Sydney, Australia.
5. KDI. (2004). Guideline for preliminary feasibility study; Road and Railway-Ver. 4, Korea Development Institute, Seoul.