1. Choi, J.-H., Lee, D.-H., Kim, S.-H., and Kim, S.-K. (2010). “Factors affecting selection combination of earthwork equipments.” Proceedings of the Korea Institute of Building Construction, Vol. 10, No. 1, pp. 201–205 (in Korean).
2. Construction Project Standard of Estimate (2015). Korea Institute of Civil Engineering and Building Technology (KICT).
3. Hwang, J.-H., Hwang, H.-W., and Kim, B.-S. (2009). “Conceptual design of earth work equipment combination optimization model using multi-objective optimization method.” Proceedings of KICEM Conference Collection of Dissertations, Vol. 2009, No. 11, pp. 205–210 (in Korean).
4. Hwang, Y.-W., Park, K.-H., and Seo, S.-W. (2000). “Assessment of CO2 emissions from road construction activities.” Journal of the Korean Society of Civil Engineers, Vol. 20, No. 1, p. 113–121 (in Korean).
5. Jang, J.-H. and Lee, S.-W. (2004). “Europe’s most recent concrete road pavement construction equipment.” Proceedings of Korean Society of Road Engineers, Vol. 2004, No. 12, pp. 15–19 (in Korean).