Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference9 articles.
1. Norbis MI, Smith JM (1988) A multi objective, multi-level heuristic for dynamic resource constrained scheduling problems. Eur J Oper Res33:30–41
2. Bean JC, Birge JR,Mittenthal J, Noon CE (1991) Match-up scheduling with multiple resources,release dates and disruptions. Oper Res 39:470–483
3. Wu SD, Storer RH, ChangPC (1993) One-machine rescheduling heuristics with efficiency and stability as criteria. Comp Oper Res 20:1–14
4. Leon, VJ, Wu SD, StorerRH (1994) Robustness measures and robust scheduling for job shops. IIE Trans26:32–43
5. Unal AT, Uzsoy R, Kiran AS (1997) Rescheduling on a single machine with part-type dependent setup times and deadlines. Ann Oper Res 70:93–113
Cited by
34 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. The discrete p-center location problem with upgrading;Omega;2023-09
2. Rescheduling Approaches for Ship Outfitting Pallet Sorting Operations;Proceedings of the 2023 6th International Conference on Mathematics and Statistics;2023-07-14
3. Rescheduling of a Single Machine Problem Thanks to Time Dependent Variable Weights;2023 9th International Conference on Control, Decision and Information Technologies (CoDIT);2023-07-03
4. Rescheduling for new orders on a single machine with rejection;Journal of the Operational Research Society;2023-04-05
5. Due date quoting and rescheduling in a fixed production sequence;International Journal of Production Research;2023-03-07