1. Zhu G, Wei P, Hou X, Gao H (2009) Study on improving integration efficiency of spacecraft pipeline. Spacecraft Engineering 18(4):78–83
2. Zhang J, Gao L, Zhang B, Fan X, Liu J (2014) Integrated manufacturing technology of pipe welding assembly process in spacecraft. Comput Integr Manuf Syst 20(11):2743–2757
3. Tang NC (2000) Plastic-deformation analysis in tube bending. Int J Pres Ves Pip 77(12):751–759
4. Bakker OJ, Papastathis TN, Popov AA, Ratchev SM (2012) Active fixturing: literature review and future research directions. Int J Prod Res (ahead-of-print):1–20
5. Jonsson M, Ossbahr G (2010) Aspects of reconfigurable and flexible fixtures. Adv Pro Eng Manag 4(4):333–339