Author:
Choi Jin-Kyu,Cho Hanbyeog,Oh Hyun-Seo,Kim Kyong-Ho,Ryu Heung-Gyoon
Publisher
Springer Berlin Heidelberg
Reference15 articles.
1. Jeong, M., Yoon, H., Park, D., Kim, K., Lee, S.: Bandwidth requirements estimation method for future wireless railway communication systems. J. Korean Soc. Railway 16(6), 540–550 (2013)
2. Calle-Sanchez, J., Molina-Garcia, M., Alonso, J.I.: Top challenges of LTE to become the next generation railway communication system. In: Proceedings of the 13th computers in railways, pp. 85–96 (2012)
3. Ai, B., et al.: Challenges toward wireless communications for high-speed railway. IEEE Trans. Intell. Transp. Syst. 15(5), 1–16 (2014)
4. Durk, J.: How to better utilise rail communications to improve the on-board customer experience. In: Special pre-conference LTE workshop (2012)
5. Ning, B., et al.: An introduction to parallel control and management for high-speed railway systems. IEEE Trans. Intell. Transp. Syst. 12(4), 1473–1483 (2011)