1. Chi E A, Wei X, Wen Y F, 2002. Oriented blasting demolition of a 100 m reinforced concrete chimney and a 80 m brick chimney. Project Blasting, (1): 27–30.
2. Luo D P, Wei X, Chi E A, 2004. Blasting demolition of urban overpasses through drilling and hydraulic pressure. In: China New Blasting Technology. Beijing: Metallurgical Industry Press, 720–723.
3. Lü S R, Yang J, Liu G Z, 2003. Research on the detection and control of high building’s oriented blasting vibration effect. Blasting, (3): 71–74.
4. Mei F X, Zhou J P, Shui X P, 2003. Engineering mechanics. Beijing: Higher Education Press.
5. SY/T 0450-2004. Design standard for anti-vibration oil and gas steel tubes.