1. Williams, J., L. Smith, and P. Wells, Planning of underground copper mining : proceedings of the 10th international symposium on the application of computer methods in the minerals industry, Johannesburg, South Africa, 10-14 April 1972 Southern African Institute of Mining and Metallurgy, Johannesburg. pp. 251-254. https://www.saimm.co.za/Conferences/Apcom72/251-Williams.pdf, 1972.
2. Kuchta M, Newman A, Topal E (2004) Implementing a production schedule at LKAB’s Kiruna Mine. Interfaces (Providence) 34(2):124–134
3. Nehring M et al (2012) Integrated short- and medium-term underground mine production scheduling. J South Afr Inst Min Metall 112(5):365–378
4. MacLean J (2017) Biggest risks for mining companies shift, yet challenges remain. Can Min J 138(1):6
5. Planeta S, Bourgoin C, Laflamme M (1990) The impact of rock dilution on undergroundmining: operational and financial considerations. In: Proc. nnd CIM Annual General Meeting, Ottawa, Ontario