Author:
Bhadoria Ashutosh,Marwaha Sanjay
Publisher
Springer Science and Business Media LLC
Reference108 articles.
1. Bhardwaj, E.A., Sharma, R.K., Bhadoria, E.A.: A case study of various constraints affecting unit commitment in power system planning. Int. J. 1(2), 1–6 (2013)
2. Senjyu, T., Miyagi, T., Saber, A.Y., Urasaki, N., Funabashi, T.: Emerging solution of large-scale unit commitment problem by stochastic priority list. Electr. Power Syst. Res. 76(5), 283–292 (2006). https://doi.org/10.1016/j.epsr.2005.07.002
3. Senjyu, T., Shimabukuro, K., Uezato, K., Funabashi, T.: A fast technique for unit commitment problem by extended priority list. IEEE Trans. Power Syst. 18(2), 882–888 (2003). https://doi.org/10.1109/TPWRS.2003.811000
4. Pang, C.K., Sheble, G.B., Albuyeh, F.: Evaluation of dynamic programming based methods and multiple area representation for thermal unit commitments. IEEE Trans. Power Appar. Syst. 100(3), 1212–1218 (1981). https://doi.org/10.1109/TPAS.1981.316592
5. van den Bosch, P.P.J., Honderd, G.: A solution of the unit commitment problem via decomposition and dynamic programming. IEEE Power Eng. Rev. 5(7), 32 (1985). https://doi.org/10.1109/MPER.1985.5528459