Author:
Chawla Viveak Kumar,Chanda Arindam Kumar,Angra Surjit
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering,Ocean Engineering,Aerospace Engineering
Reference41 articles.
1. V.K. Chawla, A. Chanda, S. Angra, The sustainable project management: a review and future possibilities. J. Proj. Manag. (2018).
https://doi.org/10.5267/j.jpm.2018.2.001
2. S.K. Kashyap, J. Thakkar, Job-shop scheduling in a make-to-order company: an application of ‘Palmer’s Heuristic Approach’ and ‘Two Machine Fictitious Rule’. J. Inst. Eng. (India) Ser. C 93(1), 103–109 (2012)
3. P. Udhayakumar, S. Kumanan, Integrated scheduling of flexible manufacturing system using evolutionary algorithms. Int. J. Adv. Manuf. Technol. 61(5), 621–635 (2012)
4. K. Sen, S. Ghosh, B. Sarkar, Comparison of customer preference for bulk material handling equipment through fuzzy-AHP approach. J. Inst. Eng. (India): Ser. C 98(3), 367–377 (2017)
5. S. Rajotia, K. Shanker, J.L. Batra, A semi-dynamic time window constrained routing strategy in an AGV system. Int. J. Prod. Res. 36(1), 35–50 (1998)
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献