1. G. SOHLENIUS(1992) Concurrent Engineering. Annals of the CIRP Vol. 41 /2, p. 645
2. J.A. BRANDON and G.Q. HUANG(1993) Use of an Agent-Based System for Concurrent Mechanical Design. Concurrent Engineering: Automation, tools and techniques, ed. A. Kusiak, John Wiley and Sons Inc., p. 463
3. F.M. VAN HOUTEN and A.H. VAN’T ERVE(1992) PART: A Feature Based Computer Aided Process Planning System. International Journal of CAD/CAM and Computer Graphics Vol. 7 /3, p. 335
4. H.S. ABDALLA and J. KNIGHT(1994) An Expert System for the Concurrent Product and Process Design of Mechanical Parts. Proc. I.Mech.E, Part B, Vol. 208 No. 3, p. 167
5. P.G. MAROPOULOS(1994) Assessment of Research in Tooling Technology, Process Modelling and Process Planning. Report for the Design and Integrated Production Committee EPSRC Grant: GR/J 60834