1. M. Mucino, CCGT performance simulation and diagnostics for operations optimisation and risk management, Ph.D. Thesis, Cranfield University (2007).
2. S. K. Oh and B. I. Kim, A design study for improving thermal efficiency of combined cycle power plant using LNG cold energy–design and off–design modeling of gas–turbine based combined cycle, Energy Eng. J., 8 (1) (1999) 159–165.
3. E. Kakaras, A. Doukelis and J. Scharfe, Applications of gas turbine plants with cooled compressor intake air, ASME Turbo Expo 2001, June (2001) GT–0110.
4. M. Ameri and S. H. Hejazi, The study of capacity enhancement of the Chabahar gas turbine installation using an absorption chiller, Applied Thermal Engineering, 24 (1) (2004) 59–68.
5. L. G. Farshi, S. S. Mahmoudi and A. H. Mosafa, Improvement of simple and regenerative gas turbine using simple and ejector–absorption refrigeration, IUST International Journal of Engineering Science, 19 (5–1) (2008) 127–136.