1. Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391–401.
2. Aiex, R. M., Binato, S., & Resende, M. G. C. (2003). Parallel GRASP with path-relinking for jobshop scheduling. Parallel Computing in Numerical Optimization, 29(4), 393–430.
3. Balas, E., & Vazacopoulos, A. (1998). Guided local search with shifting bottleneck for job shop scheduling. Management Science, 44(2), 262–275.
4. Barba, I., & Valle, C. D. (2010). A job-shop scheduling model of software development planning for constraint-based local search. International Journal of Software Engineering and its Applications, 4(4), 1–16.
5. Bensana, E., Correge, M., Bel, G., & Dubois, D. (1986). An expert-system approach to industrial job-shop scheduling. In Proceedings of IEEE international conference on robotics and automation (Vol. 3, pp. 1645–1650).