Author:
Wang Teng,Yuan Dajun,Jin Dalong,Li Xinggao
Publisher
Springer Science and Business Media LLC
Subject
Architecture,Civil and Structural Engineering
Reference39 articles.
1. Ryu Y M, Kwon Y S, Kim T H, Lee I M. Slurry clogging criteria for slurry shield tunnelling in highly permeable ground. KSCE Journal of Civil Engineering, 2019, 23(6): 2784–2793
2. Yuan D J, Huang Q F, Koizumi A, Wang M S. Study on slurry-water gushing during underwater shield tunnel construction. Journal of Rock Mechanics and Geotechnical Engineering, 2007, 026(011): 2296–2301
3. Liu X Y, Yuan D J. An in-situ slurry fracturing test for slurry shield tunnelling. Journal of Zhejiang University. Science A, 2014, 15(7): 465–481
4. Liu X Y, Yuan D J. Mechanical analysis of anti-buoyancy safety for a shield tunnel under water in sands. Tunnelling and Underground Space Technology, 2015, 47(3): 153–161
5. Baumert M E, Allouche E N, Moore I D. Experimental investigation of pull loads and borehole pressures during horizontal directional drilling installations. Canadian Geotechnical Journal, 2004, 41(4): 672–685
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献