1. Bellarby, J.: Well Completion Design. Elsevier, Amsterdam (2009)
2. Perrin, D.: Well Completion and Servicing. Petrole Ifd, Rueil-Malmaison (1999)
3. Bradley, A.B., Nagasaku, S., Verger, E.: Premium connection design, testing and installation for HPHT sour wells. SPE high pressure-high temperature sour well design applied technology workshop, 17–19 May, The Woodlands, Texas, USA, pp. 1–8 (2005)
4. Kent, S., Amiel, G., Faucon, B.: North sea gas leak could cost billions. Wall Str. J. March 29 Issue (2012)
5. Gosden, E.: Total’s Elgin gas leak costing $2.5m a day. The Telegraph, April 2 Issue (2012)