Abstract
AbstractUnder-voltage ride through (UVRT) tests can be carried out on system test benches, most of them are equipped with a converter based grid simulator. This paper describes the control of the artificial grid impedance at the 4 MW test bench at CWD. Validation measurements with the commercial wind turbine E‑115 E2 show that the virtual impedance specification is sufficient to perform UVRT tests with different grid parameters. Comparative measurements between the voltage divider based FRT Container and the grid simulator with deliberately different grid parameters show a different behavior of the research wind turbine FVA nacelle. Therefore, it is recommended to perform UVRT tests on the test bench with predefined grid parameters.
Funder
Bundesministerium für Wirtschaft und Energie
RWTH Aachen
Publisher
Springer Science and Business Media LLC
Reference14 articles.
1. Tsili M, Papathanassiou S (2009) A review of grid code technical requirements for wind farms. Iet Renew Power Gener 3(3):308. https://doi.org/10.1049/iet-rpg.2008.0070
2. International Electrotechnical Commission (Ginebra) IEC 61400-21‑1. Wind energy generation systems, 1. Aufl. IEC, Geneva (Suiza)
3. Fördergesellschaft Windenergie und andere Erneuerbare Energien (2016) Technische Richtlinien für Erzeugungseinheiten und -anlagen TR3. Bestimmung der elektrischen Eigenschaften von Erzeugungseinheiten und -anlagen am Mittel‑, Hoch- und Höchstspannungsnetz, 24. Aufl (Teil 3 (FGW TR3))
4. Noorcheshma P, Sreedevi J, Sivaprasad V (2015) Low Voltage Ride through (LVRT) of DFIG and PMSM wind turbine IEEE International Conference on Electrical, Computer and Communication Technologies (ICECCT), 2015. 5–7 March 2015, SVS College of Engineering, Coimbatore, Tamil Nadu, India ; proceedings. IEEE, Piscataway, NJ, S 1–5
5. Ausin JC, Gevers DN, Andresen B (2008) Fault ride-through capability test unit for wind turbines. Wind Energ 11(1):3–12. https://doi.org/10.1002/we.255
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献