1. O. M. Saraev, N. N. Oshkanov, V. V. Vylomov, et al., “Experience in operating power-generating unit with a BN-600 reactor,” At. Énerg., 80, No. 5, 330–337 (1996).
2. N. N. Oshkanov, M. V. Bakanov, and O. A. Potapov, “Experience in operating a BN-600 power unit at the Beloyarskaya nuclear power plant,” At. Énerg., 96, No. 5, 342–346 (2004).
3. N. N. Oshkanov, O. A. Potapov, and P. P. Govorov, “Assessment of the operating efficiency of a power-generating unit with a BN-600 fast-neutron reactor at the Beloyarskaya nuclear power plant over 25 years of operation,” Yad. Energet., No. 1, 3–9 (2005).
4. V. I. Kostin and B. A. Vasiliev, “Problems of building BN-800 and the possibility of developing advanced fast reactors,” At. Energ., 102, No. 1, 21–26 (2007).
5. N. N. Oshkanov, P. P. Govorov, and A. V. Kuznetsov, “Twenty eight years of operation. Power-generating unit with a BN-600 fast reactor: main technical-economic indicators,” Byull. Rosenergoatoma, No. 8, 34–37 (2008).