Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference10 articles.
1. W. A. Horn, “Minimizing average flow time with parallel machines”,Operations Research,21(3), pp. 846–847, 1973.
2. N. Powell,Production Planning Scheduling, and Inventory Control, The Macmillan Company, London, 1970.
3. E. L. Lawler and C. U. Martel, “Preemptive scheduling of two uniform machines to minimize the number of late jobs”,Operations Research,37(2), pp. 314–318, 1989.
4. S. K. Jain, K. L. Stott and E. G. Vasold, “Order book balancing using a combination of linear programming and heuristic techniques”,Interfaces, pp. 55–67, November 1978.
5. G. B. Dantzig, “On the status of multi-stage linear programming problems”,Management Science,6(1), pp. 53–71, 1959.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献