Author:
Deng Xiao-gang,Wang Jia-nian
Publisher
Springer Berlin Heidelberg
Reference8 articles.
1. Kumanan, Jose, S., Jegan, G.: Multi-project scheduling using an heuristic and a genetic algorithm. International Journal of Advanced Manufacturing Technology 31(3), 360–366 (2006)
2. Xing, Y., Wang, Z., Sun, J.: A fuzzy genetic algorithm for job-shop scheduling problems with fuzzy process time and due date time. Computational Intelligence and Security 3(6), 398–404 (2006)
3. Po-Han, C.: Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Automation in Construction 18(4), 434–443 (2009)
4. Watanabe, M., Ida, K.: A genetic algorithm with modified crossover operator and search arer adaptation for the job-shop scheduling problem. Computer & Industrial Engineering 48(2), 743–752 (2005)
5. Weili, Y., Deli, Y., Xiangpei, H.: A genetic algorithm for job shop scheduling problem. Operations Research and Management Science 8(2), 85–88 (1999) (in Chinese)