Author:
Dang Quang-Vinh,Nielsen Izabela Ewa,Bocewicz Grzegorz
Publisher
Springer Berlin Heidelberg
Reference12 articles.
1. Crama, Y., van de Klundert, J.: Cyclic scheduling of identical parts in a robotic cell. Oper. Res. 45, 952–965 (1997)
2. Crama, Y., van de Klundert, J.: Cyclic scheduling in 3-machine robotic flow shops. J. Sched. 2, 35–54 (1999)
3. Crama, Y., Kats, V., van de Klundert, J., Levner, E.: Cyclic scheduling in robotic flow shops. Ann. Oper. Res. 96, 97–124 (2000)
4. Dang, Q.V., Nielsen, I.E., Steger-Jensen, K.: Scheduling a single mobile robot for feeding tasks in a manufacturing cell. In: Proc. of Int. Conf. Adv. Prod. Manag. Syst., Norway (2011)
5. Dror, M., Stulman, A.: Optimizing robot’s service movement: a one dimensional case. Comput. Ind. Eng. 12, 39–46 (1987)
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献