1. Bathurst RJ, Allen TM (2023) LRFD calibration for soil failure limit state using the stiffness method. Can Geotech J 60(7):1–11. https://doi.org/10.1139/cgj-2022-0499
2. Bathurst RJ, Hatami K (1998) Seismic response analysis of a reinforced-soil retaining wall. Geosynth Int 5(1–2):127–166. https://doi.org/10.1680/gein.5.0117
3. Bathurst RJ, Huang B, Hatami K (2008) Numerical study of the influence of reinforcement length and spacing on reinforced soil segmental walls of variable height. In: GeoAmericas 2008, the First Pan American Geosynthetics Conference and Exhibition, Cancun, Mexico, pp 1256–1264
4. Berg RR, Christopher BR, Samtani NC (2009) Design and construction of mechanically stabilized earth walls and reinforced soil slopes. In: Publication No. FHWA-NHI-10–024, Federal Highway Administration, Washington, DC, USA.
5. Han J, Jiang Y, Xu C (2018) Recent advances in geosynthetic-reinforced retaining walls for highway applications. Front Struct Civ Eng 12:239–247. https://doi.org/10.1007/s11709-017-0424-8