1. Börgesson L, Hernelind J (1999) Coupled thermal-hydro-mechanical calculations of the water saturation phase of a KBS-3 deposition hole- Influence of hydraulic rock properties on the water saturation phase. SKB report TR-99-41, SKB, 102 40 Stockholm, Box 5864
2. Chijimatsu M, Nguyen TS, Jing L, De Jonge J, Kohlmeier M, Millard A, Rejeb A, Rutqvist J, Souley M, Sugita Y (2005) Numerical study of the THM effects on the near-field of a hypothetical nuclear waste repository-BMT1 of the DECOVALEX III project. Part 1: conceptualization of the problems and summary of results. Int J Rock Mech Min Sci 42(5/6):720–730
3. Chijimatsu M, Börgesson L, Hernelind J, Jing L, Nguyen TS, Rutqvist J (2008) Model development and calibration of the coupled thermal, hydraulic and mechanical phenomena on bentonite. Environ Geol (this issue)
4. Garisto F, Avis J, Calder N, Gierszewski P, Kitson C, Melnyk T, Wei K, Wojciechowski L (2005) Horizontal borehole concept case Study. OPG, NWMD, 700 University Avenue, Toronto, Ont. Canada M5G 1X6, report 06819-REP-01200-10139-R00
5. Gierszewski P, Avis J, Calder N, D’Andrea A, Garisto F, Kitson C, Melnyk T, Wei K, Wojciechowski L (2003) Third case study—postclosure safety assessment. OPG, NWMD, 700 University Avenues, Toronto, Ont. Canada M5G 1X6, report 06819-REP-01200-10109-R00