1. AUA, Raymond W. Henn (eds) (2010) Guidelines for Backfilling and Contact routing of Tunnels and Shafts ASCE Press, Reston
2. Batchelor B (2006) Overview of waste stabilization with cement. Waste Manag 26:689–698
3. Behrang P, Jacimaria R (2011) Surface complexation modeling of the removal of arsenic from ion-exchange waste brines with ferric chloride. J Hazard Mater 188:399–407
4. Belem T, Benzaazoua M (2004) An overview on the use of paste backfill technology as a ground support method in cut-and-fill mines.in: Villaescusa, Potvin (eds) Proc. of the 5th Int. Symp. on Ground support in Mining and Underground Construction, Perth, 28–30 September 2004, Perth, Tayler & Francis Group, London, pp 637–650
5. Belem T, Benzaazoua M, Bussière B (2000) Mechanical behavior of cemented paste backfill. In: 53rd annual conference of the Canadian geotechnical society, vol. 1, Monteral, 2000