Author:
Baar Tonius,Brucker Peter,Knust Sigrid
Reference22 articles.
1. R. Alvarez-Valdes, J.M. Tamarit (1989) Heuristic algorithms for resourceconstrained project scheduling: a review and an empirical analysis; in: Slowinski, R., Weglarz, J. (eds.): Advances in project scheduling, pp. 113–134, Elsevier Science Publ., Amsterdam.
2. F.F. Boctor (1996) Resource-constrained project scheduling by simulated annealing, Int. J. Prod. Res. 34, 2335–2351.
3. J. Blażewicz, J.K. Lenstra, A.H.G. Rinnooy Kan (1983) Scheduling projects subject to resource constraints: classification and complexity, Discr. Appl. Math. 5, 11–24.
4. P. Brucker, S. Knust, A. Schoo, O. Thiele (1998) A branch & bound algorithm for the resource-constrained project scheduling problem, European J. Oper. Res. 107, 272–288.
5. J.-H. Cho, Y.-D. Kim (1997) A simulated annealing algorithm for resourceconstrained project scheduling problems, J. Oper. Res. Soc. 48, 736–744.
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献