1. Wang, L., Kang, Y., Cai, Z., Zhang, Q., Zhao, Y., Zhao, H., Su, P.: The energy method to predict disc cutter wear extent for hard rock TBMs. Tunn. Undergr. Space Technol. 28, 183–191 (2012)
2. Ramoni, M., Anagnostou, G.: Tunnel boring machines under squeezing conditions. Tunn. Undergr. Space Technol. 25, 139–157 (2010)
3. Hassanpour, J., Rostami, J., Zhao, J.: A new hard rock TBM performance prediction model for project planning. Tunn. Undergr. Space Technol. 26, 595–603 (2011)
4. Xia, Y., Wu, Y., Wu, F., Liu, W., Lin, L.: Study on simulation and mechanical properties of tunnel shield cutterhead. Computer Engineering and Applications 49, 248–251 (2013). (in Chinese)
5. Tao, L., Ning, X., He, F.: Finite element analysis for main beam of open-style TBM. Mechanical Engineering and Automation, 43–47 (2013). (in Chinese)